Skip to content

Research & Development Roadmap

This roadmap connects scientific questions and software additions and improvements with people interested in pursuing them. It is a place to discuss scope and record interest. It is not a commitment to delivery dates or inclusion in a particular release.

The initial projects are proposed candidates grounded in existing capabilities and documented limitations. The Research Notes can be used to describe ongoing investigations and historical experiments.

Consider using these statuses:

  • Proposed: an idea awaiting agreement on scope and whether to pursue it.
  • Seeking contributors: a project agreed for pursuit that is inviting participation.
  • Active: contributors have confirmed that work on the stated scope is underway.
  • Completed: the stated scope has been delivered and its outcomes and validation linked.

Priority and contributers are TBD until maintainers agree on it. Record names only with the person's consent.

Project summary

Project Status Priority Scope Interested contributors Active contributors
High-order intermittency convergence Proposed TBD Fixed-field sampling and spatial-tail diagnostics TBD TBD
Timing-calibration validity and noise assumptions Proposed TBD Controlled validation and instrument-model review TBD TBD

High-order intermittency convergence

Motivation. The intermittency investigation reports sensitivity of high-order moments to rare increments. Agreement of a fitted exponent with p-model theory does not establish moment convergence or a resolved scaling interval.

Proposed work and outcomes. Review saved checkpoints first, then assess the documented 500k-pair extension and additional sampling seeds where warranted. Report moment stability, fit-window sensitivity, and local slopes separately. If tails remain unstable, investigate spatial concentration diagnostics for the direct sampler, reusing Study A arithmetic where appropriate. Expected outcomes are a reproducible convergence assessment and explicit limits on interpretation, including negative or inconclusive findings. Independent field realizations are a later scope decision; spatial sampling seeds within one field are not an ensemble of field realizations.

Existing capabilities and documentation. The direct spatial sampler and campaign runner already support fixed-field sampling, saved moments, checkpoints, and reporting. See Intermittency recovery, the direct-3D campaign, and Study A. The notes describe the 500k extension as unfinished; confirm its current status before scheduling work.

  • Status: Proposed. Priority: TBD. Scope: fixed-field validation first; tail-diagnostic implementation and ensemble extensions require separate agreement.
  • Interested contributors: TBD. Active contributors: TBD. Issue: TBD.

Timing-calibration validity and noise assumptions

Motivation. ...

Proposed work and outcomes. ...

Existing capabilities and documentation. Polyhedron, affine, and quadratic calibration methods, geometry-dependent instrument-noise weights, and independent resampled diagnostics already exist. See the timing reference and timing investigations.

  • Status: Proposed. Priority: TBD. Scope: validation and assumption review; algorithm changes are outside the initial scope.
  • Interested contributors: TBD. Active contributors: TBD. Issue: TBD.

Getting involved

Open or comment on a relevant GitHub Issue with the project name, your interests, relevant experience, and a proposed first step. If no issue exists, propose a bounded scope and its scientific acceptance criteria. Follow the repository's contribution guidance, especially before changing scientific algorithms or configuration formats.

With your consent, add your name or GitHub handle to Interested contributors in both the summary table and project section. Interest is not an assignment. Move to Active contributors and update the status only after confirming that work is underway and agreeing on scope. Replace the issue's TBD field with its actual link when one is established; do not invent issue numbers. On completion, link the delivered work and validation, and update both table and section together.